Skip to main content
servizio di ristrutturazione chiavi in mano. servicio de reforma todo incluido. all inclusive ranovation service.

Complete Restructuring

8.890,00 €

You read right,
we completely renovate your apartment
in Fuerteventura
with included materials
for only 8890+igic

OFFER’S CHARACTERISTICS

TO WHOM IS THE OFFER ADDRESSED?

To apartment owners with a maximum surface of 45mq, and composed by:

  • A livingroom with kitchen
  • A bedroom
  • A bathroom

Can I access the offer with diffferent square footage and structure?

Of course! We will simply break down the square footage and apply it to your property, respecting the configuration canons of it.

What state does my property need to be in?

It needs to be free of furniture and anything else, but don’t worry, we can dissassemble and/or store your furnitures in a warehouse by agreement, and then reassemble them once the intervention is over.

Which are the structural conditions?

If foors, coatings and plinths are present we only proceed to eliminate what isn’t stable. For the remaining surfaces we’ll proceed by superimposing the new one on the old one using a special treatment that makes it possible to perfectly adhere.

Can I trust the result of superimposing the new one on the old one?

If the old floors and coatings are sound, we guarantee the result. This will be established during the visit. It’s in our interest for it to be the best result, we won’t ever suggest you to proceed if we consider it inappropiate.

Why do you suggest superimposing?

Simply because the same results are obtained by paying half the price.  The process of removal of the old floor, coating and slith is the most expensive part for the client, the manufacturing processes are laborious. Removing the old tiling, putting it in a bath for construction waste, paying the occupations for public land of the bath to the administrations, transport, construction waste delivery to a specialized center payed according to the weight, removing the old glue from the old pavement, level the surface, prepare the floor to new pavement, restore the plaster where the plinths were removed… You surely understand that theese are all operations that require time and money, they’re all avoidable expenses! It’s exectly because of this that our offer is the most convenient in the market, we have all the experience that other operators in the sector don’t.

It isn’t possible for the prices to be this low! Clearly, you either don’t use quality materials or use low quality labor!

We’re able to mantain a fair price because we are logistically prepared, we don’t have warehouse expenses but we have trade agreements that guarantee us to gave the materials in five/seven working days. We make large purchase numbers that enables us to obtain an excellent price. Each and every work is logistically organized based on the needed professional figures, this allows us to save time. Therefore if your question is “with these prices there’s definitely something wrong” we’ll surely answer you witn a no, we are absolutely great at our job!

WHAT IS INCLUDED IN THE OFFER?

Except for the colour and shape disponibility:

  • floor
  • bathroom tiles
  • kitchen walls
  • plinths
  • bathroom sink
  • toilet
  • bidet
  • shower tray
  • taps sink
  • bidet tap
  • flush toilet mechanism
  • toilet seat
  • shower tap
  • shower set
  • all installation bolts
  • water system pipes
  • fittings for water system
  • safety faucet
  • rosettes tap
  • hydraulic fittings
  • hydraulic hose
  • discahrge connection
  • cut of the doors (if adaptables)
  • cement
  • plaster for graunding
  • floors glue
  • tiles glue
  • chemical junction bridge
  • stucco for floors
  • stucco for tiles
  • construction waste disposal (those provided by the offer)
  • the best grunt work
  • labour
  • advice
  • warranty for the performed job

What isn’t included in the offer?

  • cut doors if made of aluminium
  • door profiles if unsuitable
  • everything not specified in the included materials
CONTINUE WITH MORE QUESTIONS!

How do I get a preventive?

Simply by contacting us via This email address is being protected from spambots. You need JavaScript enabled to view it. or (+34) 681 147 004 and ask for an appointment where you’re plannning on restructuring.

Whom will I meet at the appointment for the preventive?

You’ll meet a restructure expert, not a simple seller! A consultant that is well aware of the practical, functional and aesthetic side will be available to clarify your final vision of the restructuring.

How will the appointment unfold?

We’ll listen to your needs, building together the best fairness between investment and style. Regarding the quality you won’t have to worry, it’s a fondamental clause of all our works.

When will I receive the estimate?

During the appointment! Does it seem impossible? We’re equipped to immediately confirm how much you’ll spend, we don’t like to make you waste your time.

What characteristics and guarantees do your estimates have?

Our estimates are immediate, but have validity for 10 solar days from the emission date. If accepted during such period the price won’t change at all. If after the emission you’ll propose any changes you’ll receive the difference’s amount as quickly as possible, we’ll then proceeed only after your approval. We are committed to mantien the respect of the agreed preventive because we know how important it is form you to remain in the budget.

How does the estimate’s acceptance phase work?

You’ve got three possibilities!

  • Accepting the estimate during the visit, paying everything in just one solution you’ll receive the maximum privileges: a 7% discount, that is to say 622,30€ on the entire preventive, bringing the offer at 8.267,70€, beginning of the constructions within 10 labour days. Ending of the construction period within 20 labour days guaranteed.
  • Accepting the estimate during the visit, you will get a 3% discount, that is to say 266,70€, we will fix the start date immediately. And you will only anticipate € 1500 by credit card.
  • Or you can accept during the 10 days validity of the quote with a bank payment of 30% of the total, in this case equal to 2.667,00€. Upon receipt of payment we will contact you to set start date of work.

And regarding the balance?

If you didn’t choose the option that provides the 7% discount we’ll divide the remaining sum between two rates within the period of the work’s realization.

When will the constructions start and finish?

  • Regarding the formula with the advanced payment and the 7% discount, it is guaranteer that the constructions will start within 10 laboural days since the payment, and they’ll end within 20 laboural days. Anyway, in case the process will be superior compared to the one provided in the offer, the realization times, that we are committed to respect, will be notified to you.
  • In the formula that provides the 3% discount you’ll still have fast-lane regarding the start and ending’s timing, that are aproximately 20/25 labour days to start, and 20/25 days to finish. Anyway, in case the process will be superior compared to the one provided in the offer, the realization times, that we are committed to erspect, will be notified to you.
  • Regarding the third option we will define the times together.

How will you proceed with the work?

We’ll start with the operation thet produce construction’s waste:

  • Elimination of the unsuitable surfaces for superimposing
  • Disassembly of the old bathroom fixture
  • Opening the (???tagli di traccia) in the walls to remove the ild pipes
  • Disassembly of the doors and profile’s doors
  • Disassembly of the profile’s window where necessary
  • Disassembly of the (???placchette elettriche) where necessary
  • Disposal of all the process’s construction’s waste
  • Cleaning of the area

Preparing phase for the pose(?):

  • Installation of the new plumping
  • Installation of the safety faucets
  • Installation of the hose pipes
  • Installation of the hose (?raccordi?)
  • Closing of the holes in the walls
  • Closing of all the (???scassi)
  • Cleaning of the (???scassi)
  • Surfaces cleaning
  • Application of the quimical treatment called “(???ponte di unione)”

Application’s phase for coating’s floor and plinth:

  • application of the bathroom’s coatings
  • boreder’s profile where necessary
  • Carpets application
  • profili di confine dove necessario
  • installazione battiscopa
  • superior’s plastic profile
  • installation kitchen’s coating
  • profile where necessary
  • grouting of the bathroom’s coating
  • floor's grouting
  • grouting work for kitchen’s coating
  • plinth’s grouting
  • cleaning of the pastered surfaces

First installation’s phase:

  • installation of the bathroom’s sink
  • installation of the toilet
  • installation of the bidet
  • instalation of the pre-existing doors and adjustment of them where necessary and possible
  • installation of the existing profile’s doors and adjustment of them where necessary and possible
  • installation of the existing profile’s windows and adjustment of them where necessary and possible

Ancillary installation’s phase:

We can even offer you a shower box and bathroom accessories, rather than tailored kitchens. In case you want to purchase the remaining of your own, we have all the necessary experience to install furniture and kitchens.

Completion of work:

At this point we just have to view the outcome with you, after that we’ll proceed with the premises’s cleaning. Finally we will deliver your new apartment’s keys to you.


LET’S START BY CHOOSING THE MATERIALS INCLUDED IN THE OFFER!

Floor

el calor de la madera y la práctico del gres

GRES 45 X 45 WOOD EFFECT

el clásico que no pasa de moda

GRES 45 X 45 cream

plaqueta blanca, mas luz

GRES 33.8 X 33.8 MATT WHITE

plaqueta negra, intimidad en la casa.

GRES 33.8 X 33.8 MATT BLACK

gres gris, el estilo moderno en tu casa

GRES 45 X 45 GRIGIO CEMENT EFFECT

azulejo gres grafito. el máximo del el stilo

GRES 45 X 45 GRAPHITE EFFECT

    Bathroom’s ceramic

    lavabo en ceramica blanca cuadrado

    washbasin "Gregory"

    white ceramic   48x37x13,5 cm

    lavabo en ceramica blanca redondo

    washbasin "james"

    white ceramic, 44x44x15 cm

    gres gris, el estilo moderno en tu casa

    toilet "Gregory"

    white ceramic, 40x82x67 cm

    baño inodoro ceramica blanco

    toilet "james"

    white ceramic 35x46x77 cm

    bidet ceramica blanca

    BIDET "Gregory"

    white ceramic 35x38x53 cm

    bidet porcellanato

    BIDET "james"

    white ceramic 38x35x53,5 cm

    plato ducha ceramica blanca cuadrado

    SQUARE SHOWER TRAY

    white ceramic, 70x70, 72x72, 80x80 cm

    plato ducha esquina

    corner shower tray

    white ceramic, 75x75, 80x80, 90x90 cm

      Bathroom’s coatings

      ceramica blanca

      bright white or matt 25x40

      ceramica blanca imitazione mosaico

      bright white 33x55

      baño azulejos ceramica blanco

      bright white 25X50

      azulejos marrón brillante

      bright brown 33x55

      azulejos gris baño moderno

      gray satin 20x50

      azulejos beige satinato

      satin beige 20x50

        Taps and fittings

        grifo montando serie "ouse"

        basin mixer "trace"

        miscelatore monologando serie "house"

        bidet mixer "trace"

        baño azulejos ceramica blanco

        basin mixer "lisa"

        grifo lavabo

        bidet mixer "lisa"

        grifo lavabo baño

        basin mixer "Allison"

        grifo bidet

        bidet mixer "Allison"

        conjunto ducha

        shower set "GREGORY"

        conjunto ducha

        shower set "JAMES"

        Kitchen’s coatings

        azulejos cocinas

        stone effect 25x40

        miscelatore monologando serie "house"

        antique effect 25x50

        baño azulejos ceramica blanco negro rojo beige

        bright 10x20 black, white, red, beige.

        efecto piedra

        matt gray stone effect 15,3x58,9

        plaquetas mosaico azul cocina

        blue mosaic 25x50

        azulejos blanco y negro rojo azul vierde

        bright 20x20 white, black, red, blue, green.

          we use only the best materials

            The materials included in the offer are clearly listed. The availability depends on third parties. The ambient’s photoes are purely listed. The estimate’s validity will last 10 days from the emission date. The offer is relative to the restructuring descrbed above and doesn’t intervene on structural parts of the property, of wich Lifeinfuerte Reforma isn’t responsible. The installation of bricks, tile, plinths provide for the superimposing, otherwise the proportionate surcharge will be applied.